Delay Relay Timing Modes
How does a delay relay start and reset?
| Timing mode | What to check in the timing diagram |
|---|---|
| Power-on delay | Timing begins when the timer receives power. Check the initial contact state and what happens if power is lost before the delay expires. |
| Triggered delay | A control input starts the timing cycle. Trace both a short trigger and a maintained trigger. Check whether a second trigger restarts, extends or leaves the cycle running. |
| Interval | The output changes state for a defined duration. Check which input transition starts the interval and how the output returns to its initial state. |
| Cyclic timing | The output alternates between on and off periods. Check the initial phase, whether the phases have independent settings, and the behaviour on restart. |
Reading an installed timer
For a conveyor start sequence, draw the supply, the start signal and the output on separate lines. Mark when the run command arrives and when the load is expected to start. A delay from panel power-up and a delay from the operator’s start command give different results if the panel has been powered for hours.
Output and installation
Use the full model code and its manual to check supply, time units and relay or transistor output. Compare the output rating with the actual load and its starting current. Keep the machine’s protective stop circuit independent of a general-purpose process timer.
